| Sol No.: |
Navy SBIR FY2013.1 |
| Topic No.: |
N131-023 |
| Topic Title: |
Process Optimization of Tungsten 3% Rhenium Wire |
| Proposal No.: |
N131-023-0967 |
| Firm: |
Rhenium Alloys, Inc P.O. Box 245
38683 Taylor Parkway
North Ridgeville, Ohio 44039 |
| Contact: |
Jeffrey Hobbs |
| Phone: |
(440) 309-2087 |
| Web Site: |
www.rhenium.com |
| Abstract: |
Study to investigate variables to optimize the wire drawing process of Tungsten 3% Rhenium wire and study the validation of that wire using eddy current testing. |
| Benefits: |
Produce Tungsten 3% Rhenium with the fewest number of defects and lower cost by increasing yield of crack free wire. |