DON27BZ02-NV024 TITLE: Zero-Retrofit Robotic Ammunition Handling for the MK 45 Mod 4, 5-Inch Gun Magazine
COMPONENT TECHNOLOGY PRIORITY AREA(S): Human-Machine Interfaces;Trusted AI and Autonomy
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
D The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
OBJECTIVE: Develop a zero-retrofit robotic prototype capable of identifying, lifting, and loading 70-pound, 5-inch projectiles within the unmodified physical constraints of a DDG 51 class ships’ MK 45 Mod 4 ammunition magazine during Sea State 5 conditions. This effort seeks a human-capable equivalent that matches the agility and operational tempo of a well-trained sailor, successfully removing human crews from the most physically exhausting and hazardous steps of the kill chain.
DESCRIPTION: The tight confines of a DDG 51 5-Inch ammunition magazine present a difficult challenge for automation. Traditional robotic arms require fixed mounting and large clearance envelopes, requiring complete compartment redesigns. To avoid extensive shipyard work, the robotic prototype must adapt to the ship. The prototype must navigate narrow aisles, step over "knee-knocker" coamings, and load ammunition into the existing hoists and stowage racks alongside or in place of human sailors.
The robotic prototype must execute capture and lift of 70-pound projectiles and their propelling charges, change their orientations while captured (i.e., pivot), move ammunition between stowage racks and hoists, and safely place the projectiles into the stowage racks and hoists in the proper orientation. Furthermore, the prototype must keep kinematic stability in high sea states (up to Sea State 5) while being able to continue to complete its tasking. The prototype must be resilient to electromagnetic interference (EMI)/electromagnetic pulse (EMP), and have a power supply architecture that enables sustained fire missions without the need for recharge or obstructive cables, and ability to rapidly swap power supplies without substantial downtime.
KEY PARAMETERS FOR ZERO-RETORFIT INTEGRATION:
PHASE I: Develop a concept for a humanoid or pseudo-humanoid robot meeting the key parameters for zero-retrofit magazine operations. Conduct kinematic and dynamic simulations modeling the robot extracting, pivoting, and loading rounds in a virtual MK 45 magazine under Sea State 5 conditions. Perform trade studies on single-arm versus multi-arm torque constraints and bipedal versus pseudo-humanoid (quadruped, tracked, or other) stability. Prepare a report on physical design, power management strategy, and a Phase II prototyping/testing plan.
PHASE II: Fabricate a functional prototype based on Phase I designs. Assess the prototype in a land-based magazine mockup. Mount the mockup on a multiaxis motion simulator to replicate Sea State 5 roll and pitch. Demonstrate the robot successfully extracting dummy 5-inch projectiles from standard horizontal racks, navigating an aisle, and vertically seating the propelling charges and projectiles into a simulated hoist. Refine grasping effectors and stabilization software. Deliver a prototype, testing data report, and a Phase III ruggedization and integration plan.
PHASE III DUAL USE APPLICATIONS: Ruggedize the Phase II prototype to meet MIL-STD shock, vibration, and EMI/EMP requirements. Integrate the system at a live testing facility (e.g., Naval Surface Warfare Center (NSWC), Dahlgren, or NSWC, Port Hueneme) alongside a fully functional MK 45 Mod 4-gun mount. Demonstrate a sustained, full-rate fire mission using the prototype as the primary loader. Finalize production designs, deliver the testing data, and mature the prototype for transition to Navy for shipboard demonstration. Primary commercial dual-use sectors for this technology include: Power Infrastructure, Offshore and Onshore Oil Rigs, Mining, and Nuclear facilities. Ultimately, this technology establishes a commercial benchmark for removing human operators from high-risk, physically grueling industrial roles. Doing so preserves human capital for critical cognitive tasks while drastically reducing injury rates in hazardous environments.
REFERENCES:
KEYWORDS: humanoid robotics; pseudo-humanoid; biarmed manipulation; quadrupedal robotics; MK 45 Mod 4, 5-Inch Gun; counter unmanned surface and aerial systems, counter-UxS; ammunition magazine; ammunition handling; heavy-lift robotics; zero-retrofit integration; dr
TPOC 1: Nathan Lambert
nathan.a.lambert10.civ@us.navy.milTPOC 2: Matthew Buckler
matthew.t.buckler.civ@us.navy.milTPOC3: Luke Steelman
sanford.l.steelman.civ@us.navy.mil
| 11/18/26 | Q. | Is it permissible to allow the robots to be trained via human in the loop or via force feedback like teaching. |
| A. | “Regarding Human-in-the-Loop Training and Kinesthetic/Force-Feedback Teaching”: Yes, utilizing human-in-the-loop demonstrations, teleoperation with force feedback, or kinesthetic teaching as a development and training methodology to build and refine the robot's motion-planning. | |
| 11/18/26 | Q. | 1. What specific ordnance gripping and contact restrictions apply under NAVSEA OP 4?
2. Can modifications or mechanical implements be installed into the existing stowage racks to assist the robot with ammunition extraction? 3. How should offerors model Sea State 5 dynamic motion, and will official ship-motion time histories be provided? 4. Are environmental qualification and testing to MIL-STD-461 (EMI/EMP) and MIL-S-901D (Shock) evaluated in Phase I? |
| A. | 1. In accordance with NAVSEA OP 4 safe physical ordnance handling principles:
3. The Government does not provide proprietary or classified ship-motion time histories during Phase I. Offerors should model dynamic multi-axis motion (coupled pitch, roll, and heave) representative of a DDG 51 class vessel operating in Sea State 5 (significant wave heights of 2.5 to 4.0 meters, dynamic roll up to ±15°, pitch up to ±5°, and coupled translational accelerations). Proposers may utilize standard two-parameter Bretschneider or JONSWAP wave spectra and peer-reviewed naval seakeeping literature available via the Defense Technical Information Center (DTIC) or validated open-source/commercial hydrodynamic solvers. 4. No. Physical testing, empirical qualification, or laboratory certification to MIL-STD-461 and MIL-S-901D is NOT in scope for Phase I evaluation. Phase I proposals are evaluated strictly on mechanical and kinematic feasibility: maneuvering within 24-inch aisles, traversing 6-inch coamings, maintaining dynamic stability under Sea State 5 motion, handling 70-lb payloads, and power management. Environmental ruggedization and formal MIL-STD testing are explicitly structured for Phase II planning and Phase III execution. |
|
| 11/18/26 | Q. | 1. What are the nominal physical dimensions and handling weights of the 5-inch ammunition components?
2. What are the vertical reach heights for the stowage racks and the lower hoist interface? 3. What are the overhead clearance and doorway aperture limits along the transit path? 4. Are mechanisms permitted to temporarily attach to or brace against the ship's structure during heavy lifting or high-sea-state motion? |
| A. | 1. For Phase I modeling, offerors should utilize the following nominal, unclassified physical parameters:
• Projectile: Nominal 70 lbs, ~26 inches in length, 5.0 inches in diameter. • Propelling Charge: Nominal 40–42 lbs, ~34 inches in length, cylindrical casing. • Complete Round Scope: A complete round consists of both items (combined weight ~110–112 lbs). Both components must be retrieved from tiered stowage racks and seated into the lower hoist interface. 2. • Stowage Racks: Ammunition is stowed horizontally in tiered top-down access racks extending from near-deck level (~6–12 inches) up to standard human-reach height (approximately 5.5 to 6.0 feet off the deck) with the projectiles arranged and stacked alternating tip tail horizontally with the rounds length axis perpendicular the rack axes. See(https://www.war.gov/Multimedia/Photos/igphoto/2001980903/) publicly released photo. • Hoist Interface: The lower hoist accepts the propelling charge first into the lower receiving tray (from deck level up to approximately 36 inches), with the 70-lb projectile seated directly above it. • Travel Distance: Transit distances between stowage bins and the lower hoist are localized (notionally 5 to 25 feet). 3. • Watertight Doorway (WTD) Apertures: When transitioning between magazine bays, the platform must navigate standard interior watertight doors. These doors feature a 6-inch raised deck coaming ("knee-knocker") and an effective clear vertical opening height of approximately 66 inches (5.5 feet) above the coaming. The robotic platform must possess the kinematic compliance to stoop, crouch, or maintain an envelope that clears this 66-inch aperture while traversing the 6-inch coaming. • Compartment Headroom: General deck-to-overhead plate clearance is typically 7.5 to 8.0 feet; however, localized overhead obstructions (ventilation ducting, piping, and hanging wireways) reduce effective clear headroom to approximately 6.5 to 7.0 feet (78 to 84 inches) along aisle corridors. 4. Yes. Temporary, non-destructive mechanical bracing or dynamic reaction methods (e.g., switchable magnetic deck adhesion, dynamic stanchion/rack reaction pads, or overhead stabilizing grasping) are fully permissible to assist with load balancing and overturning torque mitigation during extraction and transit. However, permanent structural alterations—such as welding brackets, drilling into deck plating, or installing fixed guide rails—are strictly prohibited under the zero-retrofit mandate. Any temporary attachment mechanism must disengage instantly in the event of an emergency stop or casualty to ensure the space remains unencumbered for human fallback crews. |
|
| 11/12/26 | Q. | The topic specifies a minimum throughput of 6 rounds per minute and an objective of 12 rounds per minute.
Could you please clarify whether these rates refer to the complete ammunition handling cycle, including extraction from storage, transportation, reorientation, and placement into the hoist, or only to the final loading operation? Additionally, would the throughput requirement apply to a single robotic platform, or could it be achieved through a coordinated system of multiple robots operating within the existing magazine space? |
| A. | 1. Scope of the Throughput Metric: The throughput parameters—specifically the Threshold of 6 rounds per minute (RPM) and Objective of 12 RPM—apply to the complete, sustained ammunition handling cycle required to feed the MK 45 Mod 4 lower hoist. This operational sequence includes identifying and extracting both the 70-pound projectile and the associated propelling charge (~40–42 lbs) from tiered horizontal stowage racks, transporting them along standard 24-inch aisles while traversing 6-inch watertight coamings, reorienting/pivoting the ammunition, and safely seating the rounds into the lower hoist interface under Sea State 5 conditions.
2. Architecture Flexibility (Single vs. Coordinated Multi-Robot): The throughput metric represents total system-level delivery performance. Offerors have flexibility in proposing a single mobile robotic platform or a coordinated team of multiple robotic units (e.g., division of labor between transit and hoist presentation). However, multi-robot architectures must strictly fit within the spatial constraints of standard 24-inch aisles without causing kinematic choke points or monopolizing the compartment footprint. Furthermore, any proposed architecture must preserve the zero-retrofit mandate and ensure sufficient clearance for a reduced human crew to operate alongside the platforms or execute manual fallback operations without physical interference. |
** TOPIC NOTICE ** |
The Navy Topic above is an "unofficial" copy from the Navy Topics in the DoW FY-27 Release 2 SBIR BAA. Please see the official DoW Topic website at www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations for any updates. The DoW issued its Navy FY-27 Release 2 SBIR Topics pre-release on November 4, 2026 which opens to receive proposals on December 2, 2026, and closes January 6, 2027 (12:00pm ET). Direct Contact with Topic Authors: During the pre-release period (November 4, through December 1 , 2026) proposing firms have an opportunity to directly contact the Technical Point of Contact (TPOC) to ask technical questions about the specific BAA topic. The TPOC contact information is listed in each topic description. Once DoW begins accepting proposals on December 2, 2026 no further direct contact between proposers and topic authors is allowed unless the Topic Author is responding to a question submitted during the Pre-release period. DoD On-line Q&A System: After the pre-release period, until December 16, 2026, at 12:00 PM ET, proposers may submit written questions through the DoW On-line Topic Q&A at https://www.dodsbirsttr.mil/submissions/login/ by logging in and following instructions. In the Topic Q&A system, the questioner and respondent remain anonymous but all questions and answers are posted for general viewing.
DoW Topics Search Tool: Visit the DoW Topic Search Tool at www.dodsbirsttr.mil/topics-app/ to find topics by keyword across all DoW Components participating in this BAA.
|